Share on print

Understanding the Update Asset Note Node: Logging Context Automatically

What is the Update Asset Note Node?

The Update Asset Note node adds or updates a note on an asset directly from your Workflow.

Update Asset Note Node


When Should I Use It?

The Update Asset Note node is useful whenever you want a Workflow to automatically log context onto an asset's record. Common examples include:

  • Recording when and why a Workflow acted on a particular asset, for future reference.
  • Keeping a running note updated with the latest relevant status or detail.
  • Leaving context for anyone reviewing the asset later, without requiring manual entry.

Why Does It Matter?

An automatically updated note can save real time for anyone investigating an asset later. Rather than having to piece together what happened from separate logs or reports, the context is already there on the asset itself.


How Do I Use It?

  1. Drag the Update Asset Note node from the right-hand column onto the canvas, and place it at the point in your Workflow where the note should be added or updated.
  2. Hover over the node and select edit to configure it.
  3. Enter the note content, which can include tokens to pull in dynamic values from the triggering event.
  4. Connect the green ball onward if your Workflow continues after the note is updated.

Common Pitfalls

  • Overwriting existing notes unintentionally: confirm whether this node appends to or replaces existing note content before relying on it for a running log.
  • Vague note content: where possible, use tokens to include specific, dynamic detail rather than a generic static message.
  • Listener node not configured correctly: the Update Asset Note node can only act on what actually makes it through the Listener node in the first place.

Related Articles

Still Need Help?

Contact our Support team. We are always happy to help.